TRYFECTA · CONFIDENTIAL · DEMO ENVIRONMENT · ILLUSTRATIVE DATA NOT FOR EXTERNAL DISTRIBUTION

The Dome — Sovereign Site Uplink

Industry 6.0 · Phase 4 · Self-Healing Autonomy

OPEN AGENTS CONSOLE
12,847
Decisions / hr
11.4ms
P99 Edge Latency
99.97%
UNS Uptime · 30d
SOVEREIGN STATUS
Sovereign · Phase 4 (1)
Cognitive · Phase 3 (4)
Predictive · Phase 2 (2)
Operations
Baby Dome · Phase 1
Operational Flow
Next 24h Plan
Asset BOM
Maintenance · Shutdown
Omniverse Twin
Infrastructure Stack
Capital & Capex
Energy
Reports
DOME OPERATING MODE
Sovereign · Self-Healing · Cosmos World-Model Active
Tracking 14 autonomous trucks, 3 drill rigs, 5 humanoid scouts, 1.2M IoNT sensors. Backhaul bonded across Starlink PNI + 6G site mesh.
EDGE COMPUTE LOAD
42%
GB300 NVL72 · 72 Blackwell · single coherent domain
DECISIONS · LAST HR
3,184
P99 latency 11.4 ms · Cosmos sims 2,406
DEMO MODE:
PAM · ON · SOVEREIGN Toggle to see what the site looks like without PAM (legacy SCADA-only)

SOP & Compliance Layer · Live

Local law · Site policies · Environment · Safety · Control system · Inventory

AI Camera Network · Holoscan Sensor Bridge

Security · Inventory · Process · Asset Mgmt · Geotech

Spatial Intelligence · Isaac Perceptor

Live Voxel Occupancy · 3D Intent Prediction
[SPATIAL-INTEL]
TRUCK-014 path intersects HSC-02 in T-minus 4.2s.
Adjusting HSC-02 velocity vector -1.2m/s.

PAM Reasoning Stream · Physics-Grounded

Live agent thought trace

UNS Namespace · Site Slice

1.2M tags

Physics Primitives · Live

PAM grounding signals · 50 Hz
The Unified Namespace is the secondary control layer the Dome injects on top of legacy SCADA / DCS / PLC systems. Every sensor, actuator, and decision lives at one canonical path. PAM consumes the namespace; humans browse it. The UNS is the bridge that lets the Dome control without ripping out the existing control system — exactly the Industry 6.0 prompt-to-field requirement.

Pit · Mining UNS Slice

enterprise/copper-one/pit-1

Processing · Refinery UNS Slice

enterprise/copper-one/processing

Energy · Microgrid UNS Slice

enterprise/copper-one/energy

Compliance & Safety UNS Slice

enterprise/copper-one/compliance
The Dome's SOP Layer is the antifragile policy spine: every PAM decision is checked against local law, site policies, environmental permits, safety envelopes, control-system health, and inventory state — before hitting the actuator. Rejections are logged with full reasoning trace. Auditors see one paper trail. This is what makes Phase 4 sovereignty operationally accountable.
01
Instrumented Remote Ops
Standalone systems connected to a central hub. Operators control equipment from safe, remote locations. Level 1 autonomy.
COMPLETE
02
Predictive Orchestration
Real-time forecasting. Predictive maintenance reduces unplanned downtime by 30–40%. Visibility-driven dispatch.
COMPLETE
03
Cognitive Integration
LLM + agent layer governs heterogeneous swarms of robots. Intent translates from natural language directly into field execution.
COMPLETE
04
Sovereign Self-Healing Autonomy
Antifragile ecosystem. Self-configures, self-heals, performs dynamic energy arbitration without human-in-the-loop for micro decisions.
ACTIVE · COPPER ONE

NVIDIA Sovereign Stack

The reference architecture the Dome implements at every site.

  • GB300 NVL72Site brain · 72 Blackwell GPUs · single coherent domain
  • Vera Rubin Superchip3.6 EFLOPS inference · long-context reasoning · roadmap
  • Jetson AGX ThorOn-equipment edge module · multimodal AI · ms-class fault detection
  • Holoscan SDKHigh-bandwidth sensor bridge (LiDAR · thermal · vibration)
  • Cosmos World ModelsImagine-then-act · zero-defect navigation · physical reasoning
  • Omniverse DSX + Isaac Lab-ArenaHigh-fidelity twin · 40× faster sim than sequential

Connectivity & Energy Sovereignty

The bubble that keeps a remote site sovereign even if the rest of the world disconnects.

  • Starlink Performance Kit>400 Mbps down · <20 ms · –40 °C → +60 °C ruggedised
  • Starlink PNI GatewayDedicated path · bypasses public internet · sovereign data
  • Peplink SDX SpeedFusionBonded multi-Starlink + 5G/6G · 99.9% uptime
  • 6G Site MeshSub-ms peer-to-peer between drills, haulers, humanoids
  • ComAp InteliNeo 6000Solar + battery + geothermal · black-start capable
  • Internet of Nano-Things (IoNT)Molecular-scale sensors in the ore body

Antifragility

The site doesn't merely resist shocks — every disruption improves its internal logic. Sandstorms, equipment failures, comms outages all become training signal.

Prompt-to-Field

High-level objectives — "increase copper recovery 2 points without exceeding water permit" — translate into physical action via the cognitive infrastructure.

Audit Gap

The real 2026 challenge is independent validation of autonomous facilities. The Dome's SOP layer logs every decision against law, policy, environment, safety, and control health — auditor-ready by design.

Every incident, hazard, near-miss and equipment-loss event across all 7 sites is auto-classified by the PAM-RCA agent against the six-bone Ishikawa categories. PAM groups recurring causes, links them to corrective actions, and tracks the "Never Again" rate — how many days each root cause has stayed eliminated since the action was logged. The fishbone below is live; numbers are last-30-day frequency.
PAM-RCA · CROSS-SITE LEARNING
217 events · 100% auto-classified · 41 actions live
An incident at Pilbara at 06:14 today became a corrective action at Bowen, Brisbane and Goldfields by 06:42. Cross-site learning loop is the moat.
"NEVER AGAIN" RATE
94%
Causes eliminated for 90+ days · network-wide
RECURRENCE PREVENTED
312
Events avoided since corrective actions · 12-month rolling

Live Fishbone · Ishikawa · last 30 days

6-bone categories · auto-classified · click any cause to drill into events
INCIDENTS 217 / 30d · network ▼ 24% MoM PEOPLE 14 Fatigue / 12-hr cap 9 Induction expired 6 Comms / handover gap METHOD 11 PTW non-compliance 8 Procedure skipped 5 Change-mgmt gap MEASUREMENT 19 Sensor drift / fault 10 SCADA tag stale 7 Calibration overdue MACHINE 22 Wear past threshold 13 Maintenance overrun 5 Spare parts shortage MATERIAL 8 Ore grade off-spec 6 Reagent variability 4 Supply-chain delay ENVIRONMENT 15 Heat / WBGT spike 12 Dust / PM10 exceedance 6 Lightning / work-stop

Category Frequency · last 30 days vs prior 30 days

PAM tracks the rate of change · cross-site rolled up
Machine
47events
Wear · maintenance overrun · spares
▼ 18% vs prior 30d
Measurement
40events
Sensor drift · SCADA staleness · calibration
▼ 12% vs prior 30d
Environment
35events
Heat · dust · lightning
▲ 9% vs prior 30d
People
33events
Fatigue · induction · comms
▼ 31% vs prior 30d
Method
27events
PTW · procedure · isolation
▼ 22% vs prior 30d
Material
21events
Grade · reagent · supply
— flat vs prior 30d

Recent Events · auto-classified by PAM-RCA

Last 10 events · cross-site
TimeSiteEventRoot causeState
06:14PilbaraPM10 boundary spike sector 12ENVIRONMENT · dust + wind shiftPAMMITIGATED
05:48Copper OneTRUCK-014 torque breachMACHINE · wear past thresholdPAMREROUTED
04:22BowenMethane sector 4-N trendingENVIRONMENT · gas migrationPAMMONITORING
02:18Pilbara SolarString-7 efficiency dropENVIRONMENT · dust accumulationPAMCLOSED
00:11GoldfieldsPan 1 evap rate +12%ENVIRONMENT · heat anomalyPAMREROUTED
23:47BrisbaneSX phase ratio driftMEASUREMENT · flow sensor driftPAMCALIBRATED
22:33ONGCCrane lift 3/4 vibrationMACHINE · pedestal bearing wearPAMINSPECTING
21:08Copper OneContractor PROD-247 induction expiredPEOPLE · induction currencyPAMRE-INDUCTED
19:54PilbaraHeat-stress flag · day shiftENVIRONMENT · WBGT 32PAMREST CYCLES
18:32BowenRoof bolt-114 micro-strainMACHINE · ground stressPAMSCHEDULED

"Never Again" Register · live

Days since last recurrence · cross-site rolled up
187 days
SX-2 phase-ratio drift: auto-recalibrate every 4 hr · alarm if > 0.04
42EVENTS PREVENTED
DONE
142 days
Truck torque breach: Cosmos pre-flight before route load · auto-reroute on envelope breach
38EVENTS PREVENTED
DONE
98 days
Induction-expired contractor at gate: ANPR + LMS sync · auto-block
61EVENTS PREVENTED
DONE
76 days
Methane sector 4-N spike: Fan 3 auto-ramp at 0.5% · pause shearer at 0.7%
14EVENTS PREVENTED
DONE
54 days
PM10 boundary exceedance: Wind-direction-aware water-truck dispatch
29EVENTS PREVENTED
DONE
31 days
Crane lift in marginal sea-state: Cosmos pre-validates swing path · operator HUD updates
8EVENTS PREVENTED
DONE
12 days
Heat-stress on day shift: WBGT triggered 15-on/5-off cycle · supervisor escalation
6EVENTS PREVENTED
LIVE
3 days
Cleaning-bot fleet swap window: spare bot pre-staged on schedule · zero string-down minutes
2EVENTS PREVENTED
VALIDATING

Recurrence Rate · 6-month trend · all categories

Lower is better · target: < 5 recurrences / 30d
DEC JAN FEB MAR APR MAY (CUR) 68 52 41 31 22 11
▼ 84% reduction in recurrences across 6 months · same 6-bone categories · same network of 7 sites. The cross-site learning loop is the moat: an incident at one site becomes a corrective action at six others within 30 minutes, and PAM tracks each one until 90 consecutive days have passed without recurrence — then it locks in as a permanent SOP rule.

The legacy ISA-95 stack is collapsing into a single UNS-centric, agentic spine.

For four decades, industrial automation has been a five-tier pyramid — PLCs at the bottom, DCS in the middle, SCADA above, MES, then ERP at the top. Each tier ran a different vendor stack with its own protocol, its own database, its own UI. The Dome doesn’t modernise that pyramid — it collapses it. Every tag becomes a path on the Unified Namespace; every controller becomes an agent; every dispatch screen becomes a VLA (Vision-Language-Action) prompt. Physical AI is the operating system of Industry 6.0, and it doesn’t coexist with the old stack — it replaces it, layer by layer, while every legacy bridge stays read-only until the customer is ready to cut over.

Industry 4.0 · ISA-95 pyramid

5-tier hierarchy · vendor-locked at every layer · data fragmented across 7+ systems
L4 · ERP SAP · Oracle L3 · MES Wonderware · AVEVA · GE Proficy L2 · SCADA / HMI Citect · Wonderware · iFix L1 · DCS / PLC ABB 800xA · Yokogawa CENTUM · Siemens S7 · Rockwell ControlLogix L0 · Field / Fieldbus Profibus · Modbus · HART · Foundation Fieldbus 7–12 vendors per site · point-to-point bridges · siloed historians

Industry 6.0 · UNS-centric agentic spine

Single namespace · pub/sub mesh · VLA + swarm + Physical AI on the edge
UNS Unified Namespace MQTT Sparkplug B VLA Vision-Language -Action PAM Process Agent Mesh Cosmos World Model + Omniverse Swarm APC Multi-agent negotiation Jetson Thor Edge inference on-asset SOP Layer Law · safety audit-ready

VLA · Vision-Language-Action

Cosmos World Model + OpenVLA + Jetson Thor

VLA models replace the HMI. Operators don’t click through screens — they speak. The model sees what the cameras see, hears what the operator wants, and acts through the swarm. Below: prompt-to-field in 4 hops, fully audited against the SOP layer before any actuator moves.

1 · PROMPT
Operator (natural language)
“Increase copper recovery by 2 points without exceeding the water permit.”
2 · UNDERSTAND
Cosmos World Model
Pulls UNS state · runs 240-frame sim across 14 candidate strategies · selects best.
3 · CHECK
SOP Layer
Validates against local law · site policy · environment · safety · control health · inventory.
4 · ACT
Swarm executes
SX feed ratio +0.04 · reagent dosing +3% · water draw stays at 87% of permit. Cathode recovery 99.4% → 99.6% in 14 minutes.

UNS supersedes legacy control protocols · one namespace, one truth

Each row collapses a legacy stack into a single UNS path
Industry 4.0 · legacyIndustry 6.0 · UNS spine
OPC UA / OPC DA · binary client/serverMQTT Sparkplug B on UNS · pub/subUNS
Modbus · HART · Profibus · EtherNet/IP · S7 · DNP3Edge UNS bridge · auto-tag harmonisationUNS
SCADA HMI · Citect / Wonderware / iFixVLA prompt + Omniverse twin viewportVLA
DCS controllers · ABB 800xA / Yokogawa CENTUMPAM agent mesh · Cosmos pre-flightPAM
APC · Aspen DMC3 / Honeywell Profit / Yokogawa ExasmocSwarm APC · multi-agent negotiation per assetSWARM
PLC ladder · structured text on Rockwell / SiemensJetson Thor on-asset edge inferencePHYSICAL AI
Historian · OSIsoft PI / AVEVA InsightUNS time-series · native · queryableUNS
MES · Wonderware MES / SAP DMUNS namespace · ISA-95 hierarchy as topicsUNS
APM / CMMS · Maximo / SAP PM / GE APMUNS asset registry + Asset BOM tabPAM
Compliance / audit · manual binders + SOP PDFsSOP Layer · every decision pre-validatedPAM
Operator dispatch · clipboard + radio + spreadsheetVLA prompt-to-field · natural languageVLA
RCA / 5-Why · post-incident manualPAM-RCA agent · auto-classified IshikawaPAM

Swarm APC · advanced process control via multi-agent negotiation

Each asset is its own agent · agents negotiate over UNS · Cosmos pre-validates · SOP layer gates execution
Haul Fleet Swarm
PILBARA · 78 trucks · CAT + Liebherr OEM-agnostic
SWARM
Each truck is its own agent. Path planning, cycle time, fuel state, queue depth at the crusher and PM10 wind-direction shared on UNS. The swarm continuously re-prices haul cycles against energy/ton and heat-stress windows; PAM picks the joint optimum, not the per-truck optimum.
+5%
Truck utilisation
−8%
Fuel/ton
−14%
PM10 events
Drill Rig Swarm
COPPER ONE · 5 rigs · pit-wide fragmentation
SWARM
Drill rigs negotiate hole patterns to optimise downstream crushing energy. Each rig considers ore body, blast-design constraints, and bit-wear. Cosmos pre-simulates four blast outcomes; the swarm commits the joint plan that minimises fragmentation variance, not per-hole drilling time.
−12%
Crushing kWh/ton
+9%
SAG throughput
−31%
Oversize rejects
Solar & Battery Swarm
PILBARA SOLAR · 640 MW · 38 cleaning bots
SWARM
Inverters, battery banks and cleaning bots all share UNS state. Cleaning bots route to highest-loss strings; battery dispatches around AEMO 5-min spot; inverters tilt against shifting cloud cover seen in the Cosmos weather model. One swarm, one objective: $/MWh.
+4%
Generation
$1.9k
Daily arbitrage
−22%
Bot-km / day
Methane & Vent Swarm
BOWEN · longwall · gas-aware autonomy
SWARM
Gas sensors, ventilation fans, the shearer and roof-bolters share gas-mass-balance state on UNS. The swarm pre-ramps Fan 3 the instant methane is predicted to climb — before the threshold, not after. Shearer pace adjusts in 50 ms loops; gas dispersion pre-simulated 60 s ahead.
0
Unplanned evacs · 90d
−28%
Vent power draw
+6%
Shearer face-time
Investor frame: stack consolidation = wallet consolidation. Every Dome customer replaces 7–12 legacy industrial vendors with one UNS-centric stack. Switching cost grows monotonically — the longer the UNS runs, the more decisions are encoded in PAM, the more the swarm has learned, the harder it is to unplug. This is the moat: not a feature, but an architectural advantage that compounds across sites.

Moonshot.   A staircase you can climb in weeks.

Copper One — what you're seeing across the rest of this dashboard — is the Phase 4 Sovereign Dome. It's the destination. But customers don't have to buy the destination to get value. The Baby Dome is the on-ramp: a bolt-on safety, weather, people-on-site and environmental layer we deploy in 6 weeks without touching a single PLC. Phase 2 (~+12 weeks) adds a read-only bridge into the existing SCADA / DCS / PLC. Phases 3 and 4 are the same hardware maturing into the cognitive co-pilot and then the Sovereign Dome you see live at Copper One. One install, four phases, zero rip-and-replace.

01
Baby Dome
Bolt-on safety, weather, people, environmental, incidents, permits, camera AI. Zero control-system risk.
DEPLOY · 6 WEEKS
02
Control System Bridge
Read-only UNS bridge into SCADA / DCS / PLC. Predictive maintenance, OEE, alarm rationalisation, energy/ton.
+ 12 WEEKS
03
Cognitive Co-Pilot
Agentic decisions in suggestion mode. Cosmos pre-flight sims. Operator approves write-back.
MONTHS 6–9
04
Sovereign Dome
Self-healing autonomy. Live today at Copper One — proof the staircase has a top.
LIVE · COPPER ONE

Phase 1 · Baby Dome — what's in the box

12 capabilities · ships in 2 flight cases · powers off any 240V outlet
🌦️WK 2
Weather & Lightning
5-day high-res forecast · live strike radar · auto work-stop at 8/5/3 km bands.
⚠️WK 1
Incident Management
Hazards · near-miss · injuries · environmental. Mobile capture · ICAM workflow · ISO 45001 audit-ready.
👷WK 3
Humans on Site (POB)
Live count, zone occupancy, lone-worker timer, mustering and emergency roll-call in seconds.
🚗WK 2
Visitor & Contractor
QR sign-in · NDA / induction acceptance · ANPR · expired credentials blocked at the gate.
📋WK 3
Permit-to-Work
Hot work · confined space · heights · isolation. Live expiry timers · supervisor sign-off.
🌫️WK 4
Air, Dust, Noise
PM2.5 / PM10 / TSP · boundary noise · vibration. Auto-dispatch water trucks at threshold.
📷WK 4
Camera AI · Safety
PPE detection · perimeter intrusion · slip / fall · stationary-vehicle. Edge inference.
🔥WK 5
Heat Stress · WBGT
Wet-bulb globe temperature drives mandatory rest / water schedules · fatigue-cap monitor.
🔔WK 4
Lone Worker Check-In
Periodic "I'm OK" pings · auto-escalation if missed · geo-fenced quiet zones.
🛠️WK 5
Asset & Inspection
QR-tagged extinguishers, harnesses, scaffolds. Last-inspected · next-due · traffic-light expiry.
🎓WK 3
Inductions & Certs
Site induction · first-aid · HRWL · forklift · heights. Auto-block at gate when expired.
WK 5
Energy & Water (R/O)
Modbus / pulse meters read-only into UNS. ESG-grade chart per site. Phase 2 turns it into optimisation.

Six-week deploy · contract → live dashboard

Same edge box ships pre-imaged · Phase 2 cutover starts week 7
WEEK 0
Kick-off
Site survey · data agreement
WEEK 1
Cloud live
Incident app rolled out
WEEK 2
Edge install
Met mast · gate kiosk
WEEK 3
Wire-up
Camera AI · POB · PTW
WEEK 4
Sensors
Air · noise · lightning
WEEK 5
Integrate
Assets · inductions · meters
WEEK 6
LIVE
GM dashboard signed off
+ WEEK 12 · PHASE 2
Read-only UNS bridge into customer SCADA / DCS / PLC
90-day historian backfill · predictive maintenance · OEE · alarm rationalisation · energy-per-ton — all on the same Baby Dome the customer is already logged in to.
Investor takeaway: Phase 1 sells on safety and visibility — buyers we already know how to convert (HSE managers, site GMs, COOs). It bills as SaaS, not capex. By Phase 2, the customer isn't evaluating us — they're expanding us. Same rack, same UNS, deeper wallet share, and 100% of Phase 1 hardware carries forward into Phase 4. The Sovereign Dome isn't where we start; it's where the staircase ends.
~6 wks
From PO to first live dashboard. No PLC integration in the critical path.
$0 capex
Hardware leased into the SaaS subscription. Customer signs an opex line, not a capital request.
3–4×
Phase 2 expansion ARR over Phase 1 once control-system tags light up on the same dashboard.
100%
of Phase 1 hardware carries forward into Phase 4. We never come back to rip and replace.
NETWORK STATE
SOVEREIGN
All 7 domes autonomous
SPATIAL COVERAGE
96.4%
3D occupancy mapped
ACTIVE FAULTS
0
Across all fractal tiers
STATE TRANSITIONS / HR
2,847
Autonomous decisions

Spatial Intelligence · How It Works

NVIDIA Isaac Perceptor · 3D Occupancy Mapping · Intent Prediction

3D Voxel Occupancy

Every site maintains a real-time 3D occupancy grid using LiDAR, radar, and camera fusion. Each voxel (volumetric pixel) is classified as free, occupied, or predicted-occupied. This enables collision avoidance, path planning, and anomaly detection at sub-meter resolution.

LiDAR fusion Radar overlay Stereo vision Sub-meter

Intent Prediction

Cosmos world models project asset trajectories 5–30 seconds ahead. When predicted paths intersect, the system adjusts velocities and routes before any physical conflict occurs. Every intent vector is logged in the UNS for audit.

Cosmos model T-minus 30s Path conflict Auto-reroute

Geofence Enforcement

Dynamic exclusion zones around active blasting, unstable ground, personnel clusters, and environmental boundaries. Zones expand and contract in real-time based on sensor input. No equipment enters a restricted voxel without explicit PAM clearance.

Dynamic zones Real-time resize PAM clearance

Swarm Coordination

Autonomous trucks, drills, and humanoid scouts negotiate routes peer-to-peer via the 6G site mesh. The spatial engine resolves contention in under 50ms — faster than any human dispatcher. Cross-site learnings propagate within 30 minutes.

6G mesh <50ms resolve Cross-site sync

Network Spatial Topology · Live

Site interconnections · data flow · state propagation paths

Fractal State Engine · Hierarchy

Component fault → System impact → Site response → Plant adaptation
State changes propagate upward through a hierarchy. A single motor fault (Level 1) causes the parent system to degrade (Level 2), the site to enter healing mode (Level 3), and the plant to shift from sovereign to predictive (Level 4). When the fault clears, states recover bottom-up. Every transition is logged and auditable.
Level 4 Plant
Level 3 Site
Level 2 System
Level 1 Component

Per-Site Health · All Domes

Click any site to drill into its Operations view

State Ripple Log · Live

Real-time fractal state transitions across the network
🤖 AGENTS CONSOLE